Friday, 29 January 2016

Institutional Regulations

There are several institutional regulations when it comes to filming. We have to rate our film based on the BBFC categories. We decided to go with an age rating of 15, due to content that may be unsuitable for younger viewers. There is no explicit language or any sexual scenes/reference to drugs, however some scenes may be upsetting, and being a horror film, it will contain some scary scenes. There are some legal issues that could come to light too, such as product placement. We have no right to use certain brands of food/clothing in our production, therefore we must avoid them. We cannot harm anybody taking part in the production either due to the ethical issues that would be brought up.
- Charlie Ball

Monday, 25 January 2016

25/01/16 Update

This week, our main aim is to complete the editing of our final production, now that we have completely finished filming. We have already begun the editing process using Final Cut Pro, and so far there has not been any major problems.

Saturday, 23 January 2016

Tuesday, 19 January 2016

19/01/16 - Filming Day 2

Today we completed our second and final day of filming our production. We felt that overall today was a more successful day of filming, as Saturday was more focused on finalising our plot, whereas today we were able to work on filming a wide variety of shot types to vastly improve our production. We decided to re-film certain sections of our footage because we felt that it would be improved by having different lighting or being shot from a different angle. A scene that we completed re-filmed involved our actor being woken up by a phone call and we re-filmed this in order to give a wider variety of shot types and to work in some more match on action. We also filmed more shots inside the house to provide a variety, as on Saturday we focused more on the outside shots.

Pre Filming Plan

As we approach our second day of filming, it is important for us to make sure that the weather was similar to the first day of filming, in order for the lighting/atmosphere to be the same. The forecast for Tuesday 19th January was as follows:

Maximum Temperature6 °C14:50Minimum Temperature-2 °C00:20
Maximum Humidity100 %00:20Minimum Humidity81 %16:20
Maximum Rainfall-- mmMinimum Rainfall-- mm
Maximum Pressure1020 hPa07:50Minimum Pressure1018 hPa00:20
Maximum Radiation-- W/m2Minimum Radiation-- W/m2
Wind Speed (Max)5 mph09:20

The overall temperature would not have had an affect on our filming, but we had to check whether there is any chance of rain, as this would alter our filming conditions. Luckily, there is no rainfall forecasted for this day.

Sunday, 17 January 2016

Filming Space

This is a floor plan of our filming space, which will obviously be subject to the shot that we are filming at the time and the location that we are using.

Saturday, 16 January 2016

Filming Day 1 - 16/01/16

Filming Day 1


Today we completed our first day of filming for our final production. Whilst we were actually at the location, we decided to make some changes with our plot and are very pleased about the progress we have made so far. We aim to continue filming on Tuesday afternoon (19/01/16), with the hope that we can complete our filming and move on to the editing stages.